BlogHotel.orgAccueil | Créer un blog | Imprimer la page Imprimer | Blog hasard Au hasard | Chercher des blogs Rechercher | Entrer dans le chat du blog Chat | | Jeux Jeux | Adminitration et édition du Blog Manager



Chinese New Year Mold Fondant Mould Baking

Finish the hot nozzle to make the tidy and beautiful.

If the step is touching the mold. Sweep the red hot seal sealing position and the upper step position with the mold. The first heating should be kept for 10 minutes within 100 degrees for preheating and dehumidification to protect the heater. Then warm up to the required temperature, if normal, you can arrange the lifting mold Buy plastic mould suppliers test. 9.10-0. 2. 11. Test the hot nozzle, then remove it and check if the sealant is rubbed to red Dan. Connect the thermostat to test the heating.1-0.. Place the mold, lay the upper mold, use the air gun to clean all the holes and the template. 10.15mm, and then the manifold The red dan was swept on the meson. Finish the hot nozzle to make the tidy and beautiful, and number each group in sequence.


Also check the screw holes of the lock manifold and whether the center nail and the anti-rotation hole are finished. Use a multimeter to carefully test each group of circuits so that there are no short circuits, open circuits, leakages, etc. 3. Trial installation of the manifold. If not, stop the installation and check the cause of the error to adjust. Be careful not to bump the tip of the nozzle during this process.2mm lower than the gate surface, the tip of the nozzle cannot be eccentric. Check the cooperation between the manifold and the hot nozzle to ensure that all the red dans are encountered, and that the glue is not leaked. Formally install the manifold, lock the manifold fixing screws (be sure to lock the balance, keep the four corners of the manifold consistent), control the manifold to be higher than the surrounding frame plane 0. 5. And sweep the red on its plane.


Check the size of each hole and focus on the depth. Lock the mold, raise the mold, and check whether the matching between the gate and the tip of the nozzle meets the requirements from the parting surface. Make sure that the fit is tight and not leaking. Install the hot nozzles at the same time, and install the center pad, center pin, anti-rotation pin. Plug the cable into the plug. 7. 12. To make the tip of the nozzle 0.05mm. 4. Clear the glitch on the template.Plastic mold hot runner installation precautions.Plastic mold hot runner installation precautions 1. Test the code template and check if the plane touches the meson red, and ensure that the template presses the manifold meson. 8. Be careful not to miss the hot nozzle seal when the manifold is officially installed. Check the height of the nozzle plane and the center pad, and the error is controlled within 0. 6., and the lines of each group are correct, ensuring that all circuits are normal

04:34 - 22/5/2020 - commentaires {0} - poster un commentaire

Description
Cute Chinese Zodiac Pendant Silicone Mold Resin Molds

Accueil
Mon Profil
Archives
Amis

Derniers Articles
- Finish the hot nozzle to make the tidy and beautiful.

Amis